Jump to content

CVL776

From IITD Wiki
Revision as of 09:58, 4 March 2026 by Prashantt492 (talk | contribs) (Creating course page via bot)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
CVL776
Construction practices and Equipment
Credits 3
Structure 3-0-0
Pre-requisites
Overlaps

CVL776 : Construction practices and Equipment

[edit]

Form work design and scaffolding, slipform and other moving forms, Shoring, Reshoring, and Backshoring in multistoreyed Building construction. Prestressing, Steel and composites construction methods: Fabrication and erection of structures including heavy structures, Prefab construction, Industrialized construction, Modular coordination. Special construction methods: High rise construction, Bridge construction including segmental construction, incremental construction and push launching techniques. Factors affecting selection of equipment - technical and economic, Analysis of production outputs and costs, Characteristics and performances of equipment for major civil engineering activities such as Earth moving, erection, material transport, pile driving, Dewatering, and Concreting.