Jump to content

CVL244

From IITD Wiki
Revision as of 09:56, 4 March 2026 by Prashantt492 (talk | contribs) (Creating course page via bot)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
CVL244
Construction practices
Credits 2
Structure 2-0-0
Pre-requisites EC35
Overlaps

CVL244 : Construction practices

[edit]

Introduction and role of technologies, Construction technologies in RC Buildings for Reinforcement, Formwork, and concreting activities, Excavation and Concreting equipment, Formwork material and Design Concepts, Formwork system for Foundations, walls, columns, slab and beams and their design, Flying Formwork such as Table form, tunnel form. Slipform, temporary structures failure, Determining construction loads and ensuring safety of slabs during construction of high rise buildings- shoring, reshoring, preshroing and backshoring technology, Top down construction technology for high rise and underground construction, Bridge construction including segmental construction, incremental construction and push launching techniques, Prefab construction.